• en
    • fr

News

The EMD E 23B: IMO III certified with only minimal changes

27 Jul 2017

The E 23 has met the challenges of increasingly stringent global emissions standards through continuous optimization of its proven design. With only minor engine changes, and avoiding high cost technologies […]

read more »

Meet the new MaK M 25 E

10 Jul 2017

Robust, flexible and IMO III certified. The new MaK M 25 E supports many application-specific requirements, while still providing its proven power and the highest uptime in the industry. All […]

read more »

ABIS Esbjerg christened

23 Jun 2015
Bolier

On Friday the 19th of June 2015 the Christening of the MV ABIS Esbjerg has taken place. The vessel has been built by CIG Shipbuilding Poland and after a successful […]

read more »

Van Oord’s first cable-laying vessel christened

12 Mar 2015
Bolier

On Saturday, 7 March, the Nexus, Van Oord’s first cable-laying vessel for constructing offshore wind parks, was christened in Rotterdam. The vessel was built by Damen Shipyards Group at its […]

read more »

Christening Kirkella H7

05 Mar 2015
Bolier

On Wednesday, 4 March, The Kirkella H7 was christened in Hull, UK. The trawler is build for UK Fisheries Ltd, a  subsidiary of Parlevliet & Van der Plas in The […]

read more »

Launching of M.V. Nordana Sky

23 Feb 2015
Bolier

On Saturday the 21th of February, the Nordana Sky is launched in Leer (Germany), a location of Shipyard Ferus Smit. She is the first in a series of six FS […]

read more »

Bolier completes first MaK Dual Fuel Retrofit

23 Jan 2015
Bolier

In collaboration with Caterpillar / MaK, Bolier has converted an existing 6M43C engine to a 6M46 Dual Fuel onboard the Coral Anthelia. The project was commissioned by Anthony Veder. In […]

read more »

MaK designed the dual fuel engine M 46 DF

28 Jan 2013
Bolier

MaK in Kiel has designed the M 46 DF – a dual fuel motor – based on the M43C engine medium speed. The M 46 DF is designed to operate on […]

read more »